Rein Dirkx
Posted June 22, 2015
Years: 2014-2016
Thesis Title: “The optimization of mine planning aspects under uncertainty: a study on infill drilling and block cave scheduling”
Current Position: Principal bij GBL (Groupe Bruxelles Lambert)
Posted June 22, 2015
Years: 2014-2016
Thesis Title: “The optimization of mine planning aspects under uncertainty: a study on infill drilling and block cave scheduling”
Current Position: Principal bij GBL (Groupe Bruxelles Lambert)